Field Truth

Three mandates won with no case studies to point to — exactly the position you're in.

01
Case 1 · Grid (TSO) · HVDC
A nine-figure, eight-year exclusive EOR mandate with one of Europe's largest grid operators (a TSO), won with zero HVDC QA/QC case studies. Europe's largest energy-transition programme — eleven offshore power stations, four EPC consortia, a dozen shipyards across Asia and the Middle East. The deal placed 400+ people across seven countries. The incumbents had supported this operator for decades, across hundreds of HVDC projects; a major specialist staffing firm in the mix had under six months of unrelated work with them and zero other TSO partnerships. We had no HVDC QA/QC case studies globally. We won both regions anyway — by mapping the 25-stakeholder buying group (11 who sign, 8 silent vetoes, 6 who decide repeat work), clearing every missing yes, and building the trust-based execution layer a competitor can't copy. The rate discussion was the final conversation, not the first.
02
Case 2 · Offshore Wind · Specialist Staffing
Three offshore-wind MSAs in 12 months for a major specialist staffing firm that had none in the market — and had never supplied offshore wind client representatives or technicians anywhere. In 12 months I secured offshore MSAs with three major developers plus key EPCs. No prior track record; the result built on methodology and structure.
03
Case 3 · Offshore Wind Developer
Two exclusive offshore scopes secured for a top-tier global offshore wind developer, with no prior offshore-wind-developer relationships anywhere. The workforce company I represented supported no offshore wind developer globally — zero track record. We still won two exclusive scopes by reading the project, mapping the org chart before the tender, and structuring the bid the Field-Truth way.

If you're a platform with no energy field wins, or a specialist with no software story and limited or no HVDC / offshore wind expertise, “we have no HVDC and offshore wind case studies yet” is not the blocker you think it is. Three times, across grid and offshore wind, with no prior track record, the system is what closed it. That's what gets installed.